<kbd id="k8qme"><code id="k8qme"></code></kbd>
<kbd id="k8qme"></kbd>
  • <s id="k8qme"><dd id="k8qme"></dd></s>
    <abbr id="k8qme"></abbr>

    open butterfly valve new mould for Saudi Arabia market

    open butterfly valve new mould for Saudi Arabia market

    Open mould for butterfly valves as per customer’s sample /Drawing or technical datas

    The below butterfly valve mould is popular in the KSA market , we open the mould as per customer’s request.

    The mould opening process as below

    1. Conduct a feasibility analysis on the product of the designed mold, Firstly, use design software to perform assembly analysis on the product drawings of each component, which is referred to as the set diagram in our work, to ensure the correctness of the product drawings before mold design. On the other hand, familiarize yourself with the importance of each component in the entire case to determine the key dimensions, which is very beneficial in mold design.

    2. After product analysis, the work to be carried out is to analyze the product and use what kind of mold structure to use, arrange the product process, determine the punching content of each process, and use design software to unfold the product. When unfolding the product, it is generally carried out from the subsequent engineering. For example, one product requires five processes, and after stamping is completed, the product is unfolded from the product drawing to the fourth, third, second, and first engineering. After unfolding a graphic, a copy is made before proceeding with the expansion work of the previous engineering. That is to say, the product development work of the fifth engineering is completed, and then detailed work is carried out. Note that this step is important and requires special attention. If this step is completed well, when drawing the mold, In the diagram, a lot of time will be saved. After determining the stamping content for each project, Including in the forming mold, the inner and outer lines of the product material thickness are retained to determine the size of the convex and concave molds.

    T-A J butterfly valve

    3.?Material preparation: Prepare materials according to the product development diagram, determine the template size in the drawing, including various fixed plates, discharge plates, convex and concave molds, inserts, etc. Pay attention to directly preparing materials in the product development diagram, which is very beneficial for drawing the mold diagram. I have seen many mold designers manually calculate the product development diagram to prepare materials, which is too inefficient. Directly drawing the template specifications and dimensions on the drawing in the form of assembly drawings can complete the material preparation on one hand, and on the other hand, it saves a lot of work in the work of mold accessories, because in the work of drawing each component, only positioning, pins, guide pillars need to be added to the material preparation drawing. Screw holes are sufficient

    J brand Butterfly valve

    ?

    4. material preparation is completed, the mold drawing can be fully entered. In the material preparation drawing, another copy can be made to draw various components, such as adding screw holes, guide pillar holes, positioning holes, and other hole positions. In the punching die, various holes need to be wire cut through wire holes, and in the forming die, the forming gap between the upper and lower molds must not be forgotten. Therefore, after these works are completed, the mold drawing of a product is almost 80% complete. In addition, in the process of drawing the mold drawing, attention should be paid to: each process, such as marking by fitters, wire cutting, etc., has a complete production layer for different processing steps, which is very beneficial for wire cutting and drawing management, such as color differentiation. Dimensioning is also a very important task, and it is also the most troublesome one because it is a waste of time.

    5. After the completion of the above drawings,? It is necessary to proofread the mold drawings, assemble all accessories, make different layers for each different mold plate, and analyze the mold assembly using the same benchmark, such as guide pillar holes, and produce each process


    Post time: Jul-08-2024
    主站蜘蛛池模板: 亚洲mv国产精品mv日本mv| 欧美日韩在线播放| 脱了美女内裤猛烈进入gif| 狂野欧美性猛xxxx乱大交| 日本高清免费网站| 在线观看污视频网站| 女人让男人桶app免费大全| 国产成人女人在线观看| 亚洲综合校园春色| 中文字幕第13亚洲另类| www五月婷婷| 热re99久久精品国产99热| 无遮挡h肉动漫网站| 国产成人污污网站在线观看| 久久综合综合久久| 97久久精品无码一区二区| 美女扒开尿眼让男人桶爽视频| 最新国产午夜精品视频不卡| 国产麻豆欧美亚洲综合久久| 免费精品一区二区三区在线观看| 久久亚洲免费视频| 国产三级在线视频播放线| 欧美精品久久天天躁| 夫不再被公侵犯美若妻| 又粗又大又猛又爽免费视频 | 真实国产乱视频国语| 无码人妻久久一区二区三区免费 | 国产又大又粗又长免费视频| 日韩不卡手机视频在线观看| 国产精品久久香蕉免费播放| 人人妻人人狠人人爽| もんのエロま资源网| 色www永久免费网站| 日韩欧美成人免费中文字幕| 国产特级毛片aaaaaa毛片| 亚洲欧美日韩在线综合福利| av72发布页| 狠狠躁天天躁无码中文字幕 | 波多野结衣无内裤护士| 天堂8在线天堂资源bt| 免费一级毛片不卡在线播放|